Cost Estimate of Grey Structure Construction

Cost Estimate of Grey Structure Construction

Cost Estimate of Grey Structure Construction

Category Details Cost (PKR)
Excavation Per cubic foot 20-30
Foundation Concrete, rebar, labor (per sq. ft) 300-500
Brickwork 45,000-50,000 bricks for 5 marla 540,000-750,000
Bricklaying Labor Per sq. ft 18-20
Cement 500-600 bags 525,000-720,000
Concrete (Slabs & Beams) Per cubic foot 120-150
Steel Reinforcement 2.5-3 tons 575,000-810,000
Roofing Concrete slab, 1,500 sq. ft 450,000-600,000
Gravel Per cubic foot 60-80
Sand Per cubic foot 50-70
Plumbing Pipes Basic setup 30,000-50,000
Electrical Conduits Basic setup 40,000-60,000
Waterproofing Membrane treatment 20,000-40,000
Labor Costs Bricklaying, steel fixing, etc. 450,000-600,000
Miscellaneous Scaffolding, waste disposal, etc. 50,000-100,000

Cost Estimate of Grey Structure Construction in Lahore

Constructing a grey structure in Lahore requires proper planning, careful cost management practices, and an intelligent cost analysis. Here, we divide the reported expenses of each grey structure building project into different categories. Note that these may be liable to change according to the quality of material, skill level, site conditions, and market trend; however, this guide gives you a rough estimate of what to expect.

1. Foundation and Excavation Costs

  • Excavation: Generally, the excavation cost for a general residential property is around PKR 20-30 per cubic foot. The usage of special equipment is likely if the site has problems with soil type, access, and groundwater. This might increase the cost.
  • Foundation: A sound and solid foundation is essential for a building’s stability. This usually includes concrete, steel rebar, and labor and costs about PKR 300-500 per square foot, depending on soil conditions and load requirements.

2. Brickwork

  • Bricks: The brick prices in Lahore are not fixed. On average, high-quality bricks cost PKR 18-19 per brick. A typical 5-marla house requires 45,000-50,000 bricks, which cost 540,000-750,000 in total.
  • Bricklaying Labor: A skilled worker’s square foot of bricklaying costs around PKR 18-20. The complexity of the brickwork and the structure’s size are key factors in the total labor costs, which start from PKR 150,000-200,000.

3. Cement and Concrete Work

  • Cement: Cement is now priced at PKR 1,050-1,200 for 50 kg a bag. The house’s basic structure is about 500-600 bags, costing between PKR 525,000-720,000.
  • Concrete (for Slabs and Beams): A cubic foot of concrete for slabs, beams, and columns costs PKR 120-150 each. Depending on the building design and specifications, the total cost for the average grey structure is PKR 200,000-300,000.

4. Steel Reinforcement

  • Steel supports the structure, particularly in areas at optimum risk to earthquakes, such as Lahore. The charges go up and down. However, the average price is usually around PKR 230-270 per kg.
  • A typical 5-marla house needs nearly 2.5-3 tons of steel. The lowest and highest prices for the steel reinforcement in the grey structure are between PKR 575,000 and 810,000.

5. Roofing (Concrete Slab)

  • Concrete Roofing: Concrete roofing expenditures include work, cement, gravel, sand, and reinforcement steel, costing about PKR 300-400 per square foot. For a standard 5-marla home with a roof area of around 1,500 square feet, roofing costs around PKR 450,000-600,000.

6. Gravel and Sand

  • Gravel: Good-quality gravel is essential to strengthen concrete mixes. The rate of gravel is almost PKR 60-80 per cubic foot. 
  • Sand: Fine sand is the only requirement for bricklaying and plastering. Prices of sand are from PKR 50-70 per cubic foot, which would imply a total demand of 1,500 cum at the cost of the order of PKR 75,000-105,000.

7. Plumbing and Electrical Conduits

  • Plumbing Pipes: You should expect to pay between PKR 30,000 and 50,000 for basic plumbing pipes. The price includes the purchase of the main water supply and drainage pipes and the labor cost of the installer. However, it excludes fixtures.
  • Electrical Conduits: Setting up electrical conduits for the wiring (excluding fixtures) typically costs about PKR 40,000-60,000.

8. Waterproofing and Damp Proofing

Moreover, Waterproofing is essential to the foundation and walls to protect them in flood-prone and high-water table areas. A range of PKR 20,000-40,000 is the standard cost for one-time typical membrane treatment and basic 5-marla homes foundation waterproofing.

9. Labor Costs

Labor costs, which are a significant part of the budget, consist of the expense for bricklaying, the pouring of concrete, the steel fixing, and overhead general construction works. Labor costs thence are about PKR 450,000-600,000 for the average house. Skilled labor is a bit more expensive, but it is worth investing in for a good reason.

10. Miscellaneous Costs

Other costs related to scaffolding, temporary site facilities, and waste disposal typically vary from PKR 50,000 to 100,000. However, the total expenses will depend on the site’s preparedness and the construction method.

Total Costs for Grey Structure Construction in Lahore

The raw materials, labor, and other requisites for a 5-marla house can cost as low as PKR 2.5 million and as high as PKR 3.5 million. Material introduction, extensive design, or the use of the best raw materials will likely increase the project’s value.

Conclusion

Construction of a grey structure in Lahore depends on several determinants, like the type of material you choose and the quality of labor. The most reliable technique, in this case, is the appropriate selection of the correct components, with the aim of successfully partnering with labor for verified preparation of the project. Both family housing and business properties being built are interconnected with the cost, which must be carefully addressed for a project to be completed within the budget.

 

Glorious Builders

DHA Construction Company in Lahore Get Direction
Bahria Town Construction Company in Lahore Get Direction