Lake City is one of the most planned societies on Raiwind Road, and many of its newer sectors are still filling up. That brings problems owners in older areas never face. These are the issues Lake City plot owners raise with us most, and how our in-house team handles each one.
Building first in a block that is still filling up
Why it happens hereNewer parts of Lake City, such as the M-7 sub-sectors, M-8 and Lake City Meadows, still have many empty plots. The first houses in a block often build before neighbours, street life and every service connection are in place.
If it is ignoredMaterial and steel going missing at night, no water connection for curing, and a site nobody watches between a contractor’s visits.
How Glorious Builders handles itWe arrange our own water for construction, stack and lock material inside the plot, and keep our own site supervisor on the job, so an empty street does not mean an unwatched site.
Lake City approval and bylaws
Why it happens hereLake City has its own building control. Drawings need approval before work starts, and setbacks, covered area and height are checked against the approved plan.
If it is ignoredFines, stopped work, or a completion problem when the house does not match the drawing.
How Glorious Builders handles itOur architects prepare and submit the drawings, and our engineers build to the approved drawing from the first day.
Foundation on open, newly developed land
Why it happens herePlots in newly developed blocks have often been levelled recently, and soil can differ from one plot to the next.
If it is ignoredA foundation copied from another house, uneven settlement and cracks in walls and slabs.
How Glorious Builders handles itOur structural engineer designs the foundation from the soil test for your plot, and our site engineer checks excavation depth, compaction, steel and concrete before anything is covered.
Seepage after heavy monsoon rain
Why it happens hereLahore received 343 mm of rain in 48 hours in July 2026 and water entered houses in many low-lying streets. A low plinth, a weak damp proof course or a flat roof without proper slope lets that water into walls and ceilings.
If it is ignoredDamp walls, salt on plaster, peeling paint and roof leaks within the first few rains.
How Glorious Builders handles itOur engineers set the plinth level for the street, lay the damp proof course at plinth level with a waterproofing layer, and give every roof proper slope, waterproofing and drainage outlets.
Falling and poor-quality groundwater
Why it happens hereLahore’s groundwater level has dropped to around 164 feet and keeps falling by about 2.6 feet a year, and experts warn that its quality is getting worse as it falls.
If it is ignoredA house that depends on a weak bore, with tanks and pipes that scale up or leak.
How Glorious Builders handles itWe build a properly lined underground tank and overhead tank, and plan the plumbing so a filtration unit can be added on the main line without breaking finished walls.
Owners who live abroad or in another city
Why it happens hereMany plot owners here live overseas or outside Lahore. When the owner is not on site, a labour contractor can cut steel, cement or curing time and the work is plastered over before anyone sees it.
If it is ignoredHidden defects that appear as cracks and leaks after possession, when the contractor is gone.
How Glorious Builders handles itOur own engineer signs off each stage before it is covered, and the owner gets stage-by-stage photo updates against the written BOQ, so steel, concrete and brickwork are checked before plaster.
No new gas connection for new houses (2026)
Why it happens hereThe federal government re-imposed the ban on new domestic gas connections in April 2026, and even paid demand notices were put on hold. This applies to every new house in Lahore, whatever the society.
If it is ignoredA kitchen and water heating planned around Sui gas that never arrives, then expensive changes after the finishing is done.
How Glorious Builders handles itOur architects plan the kitchen, geyser and roof for LPG, electric and solar from the drawing stage: cylinder space with ventilation, electric points sized for induction and heaters, and a roof ready for solar panels.
Sources: Lake City sector and possession updates (Zameen, 2026), Dawn and PDMA monsoon reports (July 2026), ARY News and ProPakistani on Lahore groundwater (October 2025), Government of Pakistan gas connection notices (April 2026).