Fazaia Housing Scheme has its own building authority and its own rules, which catch out contractors used to LDA or DHA. These are the problems Fazaia owners raise with us most, and how our in-house team handles each one.
FHS approval and paperwork delays
Why it happens hereFazaia is governed by its own building directorate, not LDA. Wrong or incomplete documents are sent back, and each resubmission can cost weeks.
If it is ignoredA plot that sits idle for one to two months before work can even start.
How Glorious Builders handles itOur architects prepare the FHS drawing set and documents correctly the first time and follow the file through approval.
Water tank and height rules
Why it happens hereAn underground water tank is required for every house in the scheme, and the overhead tank counts towards the height limit.
If it is ignoredA tank added late, or a roof structure that breaks the height rule and blocks completion.
How Glorious Builders handles itWe design the underground tank, overhead tank and roof levels into the drawing from the start, so the house passes the height check.
Foundation designed for your plot
Why it happens hereSoil is not the same on every plot, especially on land that was levelled recently.
If it is ignoredA foundation copied from another house, uneven settlement and cracks in walls and slabs.
How Glorious Builders handles itOur structural engineer designs the foundation from the soil test for your plot, and our site engineer checks excavation, compaction, steel and concrete before anything is covered.
Seepage after heavy monsoon rain
Why it happens hereLahore received 343 mm of rain in 48 hours in July 2026 and water entered houses in many low-lying streets. A low plinth, a weak damp proof course or a flat roof without proper slope lets that water into walls and ceilings.
If it is ignoredDamp walls, salt on plaster, peeling paint and roof leaks within the first few rains.
How Glorious Builders handles itOur engineers set the plinth level for the street, lay the damp proof course at plinth level with a waterproofing layer, and give every roof proper slope, waterproofing and drainage outlets.
Falling and poor-quality groundwater
Why it happens hereLahore’s groundwater level has dropped to around 164 feet and keeps falling by about 2.6 feet a year, and experts warn that its quality is getting worse as it falls.
If it is ignoredA house that depends on a weak bore, with tanks and pipes that scale up or leak.
How Glorious Builders handles itWe build a properly lined underground tank and overhead tank, and plan the plumbing so a filtration unit can be added on the main line without breaking finished walls.
No new gas connection for new houses (2026)
Why it happens hereThe federal government re-imposed the ban on new domestic gas connections in April 2026, and even paid demand notices were put on hold. This applies to every new house in Lahore, whatever the society.
If it is ignoredA kitchen and water heating planned around Sui gas that never arrives, then expensive changes after the finishing is done.
How Glorious Builders handles itOur architects plan the kitchen, geyser and roof for LPG, electric and solar from the drawing stage: cylinder space with ventilation, electric points sized for induction and heaters, and a roof ready for solar panels.
Why our houses do not run into these problems
- In-house engineers and site supervisors on every stage, not a thekedar who visits once a week
- Our own machinery and site equipment, so work does not stop when a hired machine or labour gang goes elsewhere
- No sub-letting: the team that quotes your house is the team that builds it
- Written, item-wise BOQ before work starts, 15-year structural guarantee and 5-year finishing warranty
Building this way costs more than handing the job to a labour contractor. That is why our grey structure rate is approx. Rs 3,000 to Rs 3,250 per sq ft, with the final figure set in your written BOQ. Read how a construction company should build your house instead of reselling it.
Sources: Dawn and PDMA monsoon reports (July 2026), ARY News and ProPakistani on Lahore groundwater (October 2025), Government of Pakistan gas connection notices (April 2026).