Glorious Builders Construction Company in Al Kabir Town Lahore

Get Free Quote
Al Kabir Town Lahore Phase 1 · Phase 2 · Kings Town · Main Raiwind Road

Construction Company
in Al Kabir Town Lahore

Grey structure, turnkey construction, and renovation across all Al Kabir Town phases Phase 1, Phase 2, and Kings Town (Phase 3). LDA approved. All plot sizes from 3 Marla to 1 Kanal. Lahore's most affordable quality construction. Fixed price. 5-year warranty. Founded 2000.

2000
Year
Founded
4.8★
134 Google
Reviews
500+
Projects
Lahore
5-yr
Written
Warranty
Al Kabir Town 2026 Rates
Grey StructureRs 2,500–2,650/sqft
Economy TurnkeyRs 5,200–5,900/sqft
Mid-Range TurnkeyRs 6,200–6,800/sqft
3 Marla GreyRs 22–28 Lac
5 Marla GreyRs 38–46 Lac
10 Marla GreyRs 78–88 Lac
LDA ApprovalHandled by GB

Al Kabir Town 2026 rates: Grey structure Rs 2,500–2,650/sqft. Economy turnkey Rs 5,200–5,900/sqft. Mid-range turnkey Rs 6,200–6,800/sqft. All phases covered Phase 1, Phase 2, Kings Town. LDA approved. 5-year warranty.

Adjacent areas also served: Bahria Orchard, Lake City, Etihad Town, and all Raiwind Road corridor societies under the same team and standards.

Al Kabir Town is Lahore's premier affordable housing society a four-phase LDA-approved development on Main Raiwind Road, launched in 2016 by Al Kabir Developers. Located adjacent to Lake City and Bahria Orchard, it offers the Raiwind Road corridor lifestyle Ring Road access, modern gated community, parks, schools, and commercial facilities at plot prices that are accessible to middle-income families and first-time homeowners. Phase 2's Adda Plot interchange on the Lahore Ring Road means residents can reach DHA, Gulberg, and the airport in under 30 minutes.

Al Kabir Town's construction market is dominated by 3 Marla and 5 Marla residential builds the most common plot sizes in the society. This is Lahore's most active small-plot construction segment, and it requires a contractor who understands the specific engineering challenges of compact residential builds: maximising covered area within tight plot boundaries, optimising room layouts for small footprints, and ensuring structural quality that is not compromised by the smaller scale. Glorious Builders has delivered 3 Marla and 5 Marla projects across Etihad Town, Bahria Orchard, and Lake City the same Raiwind Road corridor bringing that specific expertise directly to Al Kabir Town clients.

The same Grade-60 rebar, the same DG Khan or Lucky cement, and the same 5-year warranty that applies to a DHA Lahore project applies equally to a 3 Marla build in Al Kabir Town Phase 2. Quality does not scale with plot size at Glorious Builders it is a constant across every project regardless of location or size.

Al Kabir Town vs Bahria Orchard vs Lake City Which is Better to Build?

All three societies occupy the same Raiwind Road corridor and share Ring Road accessibility. Al Kabir Town is the most affordable entry point plot prices are significantly lower than Bahria Orchard or Lake City, and construction costs reflect the same differential. For owner-occupiers who want to own their home in this corridor without the Bahria Orchard or Lake City land premium, Al Kabir Town offers excellent value. For investors, the lower land cost means higher construction cost as a percentage of total investment something to factor into ROI calculations.

LDA Approval in Al Kabir Town What Changes Between Phases

All Al Kabir Town phases are LDA-approved, which means construction requires standard LDA submission through the One Window Cell. Unlike Bahria Town's BTAP process or DHA's authority system, LDA approval timelines and requirements vary by block and plot category. Phase 2's developed blocks have established utility connections and road infrastructure which simplifies construction logistics significantly. Kings Town (Phase 3) has completed development in Sector A with Sector B actively developing. Our PCATP-licensed architects handle the complete LDA submission for all Al Kabir Town phases.

All Phases

Al Kabir Town Lahore Phase 1, Phase 2 & Kings Town

Complete coverage across all phases. Our team knows each phase's LDA requirements, block infrastructure status, and utility connections.

Phase 1 Completed
Phase 1 A Block
3 Marla · 5 Marla residential & commercial
Blocks: A Block · A Block Extension · Commercial A Block

The first and oldest Al Kabir Town phase. Fully developed with possession handed over. A Block and A Block Extension are active with new builds on available plots and renovation of Phase 1's earliest homes. Commercial A Block has shops and small offices. The most established community in Al Kabir Town with a resident population already in place.

Phase 2 Most Active
Phase 2 Multiple Blocks
3 Marla · 5 Marla · 8 Marla · 10 Marla · 1 Kanal
Blocks: Ali · Umar · Usman · Abu Bakar · A · B · C · D · E · Downtown · Broadway Commercial · Jinnah Avenue Commercial

Lahore's most active affordable housing construction zone. Phase 2 directly opposite Lake City's main boulevard on Main Raiwind Road with the Ring Road's Adda Plot interchange minutes away. Ali, Umar, Usman, and Abu Bakar blocks are named residential blocks with active construction. Downtown, Broadway, and Jinnah Avenue provide commercial construction opportunities. MCB bank, restaurants, and major retailers already operational. Most diverse plot size range in all of Al Kabir Town.

Phase 3 Kings Town
Kings Town / Phase 3
3 Marla · 5 Marla
Sectors: Sector A (developed) · Sector B · Overseas Block · Executive Block

Kings Town is the commonly used name for Al Kabir Town Phase 3. Sector A is completely developed with possession and active construction. Sector B, Overseas Block, and Executive Block are under active development with new bookings available. Overseas Block specifically designed for overseas Pakistani investors similar to Bahria Orchard's OLC blocks. Jumairah Park Villas by Al Kabir Developers located within Kings Town offers eco-friendly villa options.

2026 Rates

Al Kabir Town Construction Cost Lahore 2026

Fixed-price contracts. Same Grade-60 rebar and 5-year warranty as DHA and Bahria Town projects.

TypeEconomyStandard A-GradeMid-RangeIncludes
Grey StructureRs 2,500/sqftRs 2,580/sqftRs 2,650/sqftFoundation, columns, beams, brickwork, all slabs, rough plumbing + electrical conduit
Economy TurnkeyRs 5,200/sqftRs 5,600/sqftGrey + local tiles, standard kitchen, local sanitary, local doors, paint
Mid-Range TurnkeyRs 6,200/sqftRs 6,800/sqftGrey + imported tiles, modular kitchen, quality sanitary, solid wood doors, POP ceiling
RenovationRs 1,000/sqftRs 1,600/sqftRs 2,800/sqftKitchen, bathrooms, flooring, paint, electrical upgrade, woodwork

Budget by Plot Size Al Kabir Town 2026

Plot SizeGrey StructureEconomy TurnkeyMid-Range TurnkeyTimeline
3 Marla (G+1)Rs 22–28 LacRs 32–42 LacRs 44–54 LacGrey 2–3 months · Turnkey 6–8 months
5 Marla (G+1)Rs 38–46 LacRs 55–68 LacRs 70–85 LacGrey 3–4 months · Turnkey 8–10 months
8 Marla (G+1)Rs 55–65 LacRs 78–94 LacRs 98 Lac–1.1 CroreGrey 3–4 months · Turnkey 9–11 months
10 Marla (G+1)Rs 78–88 LacRs 1.0–1.18 CroreRs 1.22–1.4 CroreGrey 4–5 months · Turnkey 10–12 months
Why Same Quality at Lower Cost

Al Kabir Town construction costs are 5 to 8 percent lower than Bahria Orchard and 10 to 15 percent lower than DHA Lahore for the same material specification. Same Grade-60 rebar, same DG Khan or Lucky cement, same 15-year structural guarantee. The cost difference reflects land access logistics and approval complexity not material quality. For our full construction cost breakdown see the 10 Marla cost guide.

Services

Complete Construction Services Al Kabir Town Lahore

Most Popular
Grey Structure
Rs 2,500–2,650/sqft

Foundation to roof slab across all Al Kabir Town phases. Grade-60 rebar. DG Khan or Lucky cement. LDA inspection coordinated. Fixed price. 15-year structural guarantee. All plot sizes 3 Marla to 1 Kanal.

View Service →
Complete Home
Turnkey Construction
Rs 5,200–6,800/sqft

Move-in-ready home. Grey structure plus all finishing. One fixed price from day one to handover. 5-year warranty covers all workmanship and materials. LDA approval and LESCO connection handled.

View Service →
Transform
Renovation
Rs 1,000–2,800/sqft

Phase 1 homes from 2016–2020 are reaching renovation age. Kitchen, bathroom, full interior upgrades. 40–60% cheaper than rebuilding. Free structural assessment before any commitment.

View Service →
Design
Architectural Design
From Rs 60,000

PCATP-licensed architects for small and large plot designs. 3 Marla layout optimisation is a specialty maximising space within compact footprints. LDA submission handled. Zero rejection record.

View Service →
Engineering
Structural Drawings
From Rs 35,000

Complete structural drawing sets for LDA submission. PEC-registered engineers. Phase-specific requirements for Al Kabir Town Phase 1, 2, and Kings Town all handled separately.

View Service →
Interiors
Interior Design
From Rs 1,500/sqft

Residential interior design for all Al Kabir Town plot sizes. Space-efficient modular kitchens, built-in wardrobes, false ceilings. 3D design before work begins. Specialised compact-home solutions.

View Service →
Why Glorious Builders

Why Al Kabir Town Clients Choose Glorious Builders

Same Standard as DHA At Lower Cost

Every Al Kabir Town project uses Grade-60 rebar, DG Khan or Lucky cement, and first-quality bricks the same specification as our DHA and Bahria Town projects. Lower cost does not mean lower quality. The 5-year warranty and 15-year structural guarantee apply equally to a 3 Marla build in Phase 2 as to a 1 Kanal in DHA Phase 6.

Small Plot Expertise

3 Marla construction has specific engineering requirements column sizing, slab thickness, load calculations, and layout optimisation that differ significantly from 10 Marla or 1 Kanal projects. Glorious Builders has extensive experience with compact residential builds across the entire Raiwind Road corridor. We maximise your covered area, optimise your layout, and deliver a structurally sound home within your footprint.

Fixed Price No Surprises

Itemised contract with every material specified by brand and grade. Milestone payments on verified progress. The price at signing is the price at handover. Our 134 public Google reviews from 2019 to 2026 contain no mention of mid-project cost escalation not a single case.

Weekly Video Every Friday

Every Friday, a WhatsApp video from your Al Kabir Town construction site arrives without you asking. Standard on every project regardless of plot size or contract value. The most cited positive in our 4.8-star 134-review Google profile.

Overseas Clients Kings Town OLC Block

Kings Town's Overseas Block is designed for overseas Pakistani investors. Glorious Builders manages complete remote construction video consultation, digital contract, milestone payments, weekly video. UK office: +44 7879 771153. See our overseas guide.

Raiwind Road Corridor Expertise

Our team works across the entire Raiwind Road corridor Al Kabir Town, Bahria Orchard, Lake City, Etihad Town. One team, consistent quality, shared logistics which reduces costs compared to contractors who operate in one society only.

Overseas Pakistanis

Build in Al Kabir Town From Abroad

Kings Town's dedicated Overseas Block along with Phase 2's affordable plot sizes makes Al Kabir Town one of Lahore's most accessible construction options for overseas Pakistanis on a budget. Many overseas families want to build their permanent home in Lahore without spending on DHA or Bahria Orchard land prices Al Kabir Town Phase 2 or Kings Town Overseas Block is the answer. Glorious Builders manages complete remote construction without site visits. For the full overseas process see our overseas Pakistani construction guide. UK office: +44 7879 771153 (London SW17).

FAQ

Al Kabir Town Lahore Frequently Asked Questions

Grey structure in Al Kabir Town costs Rs 2,500 to Rs 2,650 per sqft in 2026. Economy turnkey costs Rs 5,200 to Rs 5,900 per sqft. Mid-range turnkey costs Rs 6,200 to Rs 6,800 per sqft. A 3 Marla grey structure costs Rs 22 to Rs 28 Lac. A 5 Marla grey structure costs Rs 38 to Rs 46 Lac. Al Kabir Town construction costs are 5 to 8 percent lower than Bahria Orchard for the same Grade-60 rebar and 5-year warranty standard.
Phase 2 is the most active construction zone in 2026 particularly Ali, Umar, Usman, and Abu Bakar blocks. Development is complete, utilities are operational, and possession is available across most plots. Kings Town Sector A is fully developed for immediate construction. Phase 1 is established but has limited available plots. For overseas Pakistanis, Kings Town's Overseas Block and Phase 2 are the best options.
A 3 Marla grey structure in Al Kabir Town costs Rs 22 to Rs 28 Lac in 2026 for a G+1 home. Economy turnkey costs Rs 32 to Rs 42 Lac. Mid-range turnkey with imported tiles and quality bathrooms costs Rs 44 to Rs 54 Lac. Timeline: grey structure 2 to 3 months, complete turnkey 6 to 8 months. All rates include Grade-60 rebar and premium cement same specification as larger plots.
Yes. Glorious Builders handles complete LDA approval for all Al Kabir Town phases architectural drawings, structural drawings, site plan, ownership documents, and all required forms. Submitted through LDA's One Window Cell. Zero rejection record. You visit no authority office at any stage.
Yes. Kings Town's Overseas Block is specifically designed for overseas Pakistani investors. Glorious Builders manages complete remote construction video consultation, 3D design on WhatsApp, digital contract, milestone payments with photo and video proof, weekly Friday site video. UK office: +44 7879 771153. See our overseas Pakistani construction guide.

Ready to build in Al Kabir Town Lahore?

Free site assessment. Fixed-price contract. 5-year warranty. LDA approvals handled. Overseas clients welcome UK: +44 7879 771153.

+92 323 9999 450  ·  cc@gloriousbuilders.com  ·  UK: +44 7879 771153