Glorious Builders Construction Company in Al Kabir Town Lahore

Looking for the best construction company in Lahore? Compare written BOQs, past projects and guarantees before you sign.

Get Your Quote
Al Kabir Town Lahore Phase 1 · Phase 2 · Kings Town · Main Raiwind Road

Construction Company
in Al Kabir Town Lahore

Grey structure, turnkey construction, and renovation across all Al Kabir Town phases Phase 1, Phase 2, and Kings Town (Phase 3). LDA approved. All plot sizes from 5 Marla to 1 Kanal. Lahore's most affordable quality construction. Written BOQ contract. 5-year warranty. Founded 2000.

2000
Year
Founded
4.8★
270 Google
Reviews
500+
Projects
Lahore
5-yr
Written
Warranty
Al Kabir Town 2026 Rates
Grey StructureRs 3,000 to Rs 3,250/sqft
Economy Turnkeypriced on your written BOQ
Mid-Range Turnkeypriced on your written BOQ
5 Marla GreyRs 51–63 Lac
10 Marla GreyRs 96 Lac–1.1 Crore
LDA ApprovalHandled by GB

Al Kabir Town 2026 rates: Grey structure Rs 3,000 to Rs 3,250/sqft. Economy turnkey priced on your written BOQ. Mid-range turnkey priced on your written BOQ All phases covered Phase 1, Phase 2, Kings Town. LDA approved. 5-year warranty.

Our builders in Lake City Lahore handle map approval, grey structure and finishing under one written contract.

Have a plot in Bahria Town? Talk to our Bahria Town Lahore construction company team about design, approvals and a written BOQ.

Building in DHA? Glorious Builders is a construction company in DHA Lahore with its office in Phase 6, working under a written BOQ and a 15-year structural guarantee.

Adjacent areas also served: Bahria Orchard, Lake City, Etihad Town, and all Raiwind Road corridor societies under the same team and standards.

Al Kabir Town is Lahore's premier affordable housing society a four-phase LDA-approved development on Main Raiwind Road, launched in 2016 by Al Kabir Developers. Located adjacent to Lake City and Bahria Orchard, it offers the Raiwind Road corridor lifestyle Ring Road access, modern gated community, parks, schools, and commercial facilities at plot prices that are accessible to middle-income families and first-time homeowners. Phase 2's Adda Plot interchange on the Lahore Ring Road means residents can reach DHA, Gulberg, and the airport in under 30 minutes.

Al Kabir Town's construction market is dominated by 5 Marla residential builds the most common plot sizes in the society. This is Lahore's most active small-plot construction segment, and it requires a contractor who understands the specific engineering challenges of compact residential builds: maximising covered area within tight plot boundaries, optimising room layouts for small footprints, and ensuring structural quality that is not compromised by the smaller scale. Glorious Builders has delivered 5 Marla projects across Etihad Town, Bahria Orchard, and Lake City the same Raiwind Road corridor bringing that specific expertise directly to Al Kabir Town clients.

The same Grade-60 rebar, the same DG Khan or Lucky cement, and the same 5-year warranty that applies to a DHA Lahore Quality does not scale with plot size at Glorious Builders it is a constant across every project regardless of location or size.

Al Kabir Town vs Bahria Orchard vs Lake City Which is Better to Build?

All three societies occupy the same Raiwind Road corridor and share Ring Road accessibility. Al Kabir Town is the most affordable entry point plot prices are significantly lower than Bahria Orchard or Lake City, and construction costs reflect the same differential. For owner-occupiers who want to own their home in this corridor without the Bahria Orchard or Lake City land premium, Al Kabir Town offers excellent value. For investors, the lower land cost means higher construction cost as a percentage of total investment something to factor into ROI calculations.

LDA Approval in Al Kabir Town What Changes Between Phases

All Al Kabir Town phases are LDA-approved, which means construction requires standard LDA submission through the One Window Cell. Unlike Bahria Town's BTAP process or DHA's authority system, LDA approval timelines and requirements vary by block and plot category. Phase 2's developed blocks have established utility connections and road infrastructure which simplifies construction logistics significantly. Kings Town (Phase 3) has completed development in Sector A with Sector B actively developing. Our PCATP-licensed architects handle the complete LDA submission for all Al Kabir Town phases.

All Phases

Al Kabir Town Lahore Phase 1, Phase 2 & Kings Town

Complete coverage across all phases. Our team knows each phase's LDA requirements, block infrastructure status, and utility connections.

Phase 1 Completed
Phase 1 A Block
Blocks: A Block · A Block Extension · Commercial A Block

The first and oldest Al Kabir Town phase. Fully developed with possession handed over. A Block and A Block Extension are active with new builds on available plots and renovation of Phase 1's earliest homes. Commercial A Block has shops and small offices. The most established community in Al Kabir Town with a resident population already in place.

Phase 2 Most Active
Phase 2 Multiple Blocks
Blocks: Ali · Umar · Usman · Abu Bakar · A · B · C · D · E · Downtown · Broadway Commercial · Jinnah Avenue Commercial

Lahore's most active affordable housing construction zone. Phase 2 directly opposite Lake City's main boulevard on Main Raiwind Road with the Ring Road's Adda Plot interchange minutes away. Ali, Umar, Usman, and Abu Bakar blocks are named residential blocks with active construction. Downtown, Broadway, and Jinnah Avenue provide commercial construction opportunities. MCB bank, restaurants, and major retailers already operational. Most diverse plot size range in all of Al Kabir Town.

Phase 3 Kings Town
Kings Town / Phase 3
Sectors: Sector A (developed) · Sector B · Overseas Block · Executive Block

Kings Town is the commonly used name for Al Kabir Town Phase 3. Sector A is completely developed with possession and active construction. Sector B, Overseas Block, and Executive Block are under active development with new bookings available. Overseas Block specifically designed for overseas Pakistani investors similar to Bahria Orchard's OLC blocks. Jumairah Park Villas by Al Kabir Developers located within Kings Town offers eco-friendly villa options.

2026 Rates

Al Kabir Town Construction Cost Lahore 2026

Written BOQ contracts. Same Grade-60 rebar and 5-year warranty as DHA and Bahria Town projects.

TypeEconomyStandard A-GradeMid-RangeIncludes
Grey StructureRs 3,000 to Rs 3,250/sqftRs 3,000–3,250/sqftRs 3,000–3,250/sqftFoundation, columns, beams, brickwork, all slabs, rough plumbing + electrical conduit
Economy Turnkeypriced on your written BOQpriced on your written BOQGrey + local tiles, standard kitchen, local sanitary, local doors, paint
Mid-Range Turnkeypriced on your written BOQpriced on your written BOQGrey + imported tiles, modular kitchen, quality sanitary, solid wood doors, POP ceiling
RenovationAfter paid site visitAfter paid site visitAfter paid site visitKitchen, bathrooms, flooring, paint, electrical upgrade, woodwork

Budget by Plot Size Al Kabir Town 2026

Plot SizeGrey StructureEconomy TurnkeyMid-Range TurnkeyTimeline
5 Marla (G+1)Rs 51–63 LacAs per BOQAs per BOQGrey 3–4 months · Turnkey 8–10 months
8 Marla (G+1)Rs 78–98 LacAs per BOQAs per BOQGrey 3–4 months · Turnkey 9–11 months
10 Marla (G+1)Rs 96 Lac–1.1 CroreAs per BOQAs per BOQGrey 4–5 months · Turnkey 10–12 months
Why Same Quality at Lower Cost

Al Kabir Town construction costs are 5 to 8 percent lower than Bahria Orchard and 10 to 15 percent lower than DHA Lahore for the same material specification. Same Grade-60 rebar, same DG Khan or Lucky cement, same 15-year structural guarantee. The cost difference reflects land access logistics and approval complexity not material quality. For our full construction cost breakdown see the 10 Marla cost guide.

Services

Complete Construction Services Al Kabir Town Lahore

Know Before You Build

Building a House in Al Kabir Town Lahore: Real Problems and How We Solve Them

Al Kabir Town on Raiwind Road has phases and blocks at very different stages of development. These are the problems owners here raise with us most, and how our in-house team handles each one.

Checking approvals before you build

Why it happens hereIn private schemes, the developer needs LDA approval to provide utilities such as gas, and building drawings need the society’s or LDA’s approval before work starts.

If it is ignoredA house built in a block whose approvals or utilities are not in place, or fines and stopped work for building without an approved drawing.

How Glorious Builders handles itOur architects check the approval position of your block and submit your drawings for approval before we start, and our engineers build to the approved drawing.

Building first in a developing block

Why it happens hereMany blocks here are newly developed, with empty plots on both sides and services still being connected.

If it is ignoredMaterial going missing, no water connection for curing, and a site no one watches between a contractor’s visits.

How Glorious Builders handles itWe arrange our own water for construction, keep material locked inside the plot, and keep our own site supervisor on the job every working day.

Foundation designed for your plot

Why it happens hereSoil is not the same on every plot, especially on land that was levelled recently.

If it is ignoredA foundation copied from another house, uneven settlement and cracks in walls and slabs.

How Glorious Builders handles itOur structural engineer designs the foundation from the soil test for your plot, and our site engineer checks excavation, compaction, steel and concrete before anything is covered.

Falling and poor-quality groundwater

Why it happens hereLahore’s groundwater level has dropped to around 164 feet and keeps falling by about 2.6 feet a year, and experts warn that its quality is getting worse as it falls.

If it is ignoredA house that depends on a weak bore, with tanks and pipes that scale up or leak.

How Glorious Builders handles itWe build a properly lined underground tank and overhead tank, and plan the plumbing so a filtration unit can be added on the main line without breaking finished walls.

Owners who live abroad or in another city

Why it happens hereMany plot owners here live overseas or outside Lahore. When the owner is not on site, a labour contractor can cut steel, cement or curing time and the work is plastered over before anyone sees it.

If it is ignoredHidden defects that appear as cracks and leaks after possession, when the contractor is gone.

How Glorious Builders handles itOur own engineer signs off each stage before it is covered, and the owner gets stage-by-stage photo updates against the written BOQ, so steel, concrete and brickwork are checked before plaster.

No new gas connection for new houses (2026)

Why it happens hereThe federal government re-imposed the ban on new domestic gas connections in April 2026, and even paid demand notices were put on hold. This applies to every new house in Lahore, whatever the society.

If it is ignoredA kitchen and water heating planned around Sui gas that never arrives, then expensive changes after the finishing is done.

How Glorious Builders handles itOur architects plan the kitchen, geyser and roof for LPG, electric and solar from the drawing stage: cylinder space with ventilation, electric points sized for induction and heaters, and a roof ready for solar panels.

Why our houses do not run into these problems

  • In-house engineers and site supervisors on every stage, not a thekedar who visits once a week
  • Our own machinery and site equipment, so work does not stop when a hired machine or labour gang goes elsewhere
  • No sub-letting: the team that quotes your house is the team that builds it
  • Written, item-wise BOQ before work starts, 15-year structural guarantee and 5-year finishing warranty

Building this way costs more than handing the job to a labour contractor. That is why our grey structure rate is approx. Rs 3,000 to Rs 3,250 per sq ft, with the final figure set in your written BOQ. Read how a construction company should build your house instead of reselling it.

Sources: Dawn and PDMA monsoon reports (July 2026), ARY News and ProPakistani on Lahore groundwater (October 2025), Government of Pakistan gas connection notices (April 2026). Zameen News on LDA approval and gas connections in private schemes.

Why Glorious Builders

Why Al Kabir Town Clients Choose Glorious Builders

Same Standard as DHA At Lower Cost

Every Al Kabir Town project uses Grade-60 rebar, DG Khan or Lucky cement, and first-quality bricks the same specification as our DHA and Bahria Town projects. Lower cost does not mean lower quality.

Small Plot Expertise

Glorious Builders has extensive experience with compact residential builds across the entire Raiwind Road corridor. We maximise your covered area, optimise your layout, and deliver a structurally sound home within your footprint.

Written BOQ No Surprises

Itemised contract with every material specified by brand and grade. Milestone payments on verified progress. The price at signing is the price at handover. Our 270 public Google reviews from 2019 to 2026 contain no mention of mid-project cost escalation not a single case.

Weekly Video Every Friday

Every Friday, a WhatsApp video from your Al Kabir Town construction site arrives without you asking. Standard on every project regardless of plot size or contract value. The most cited positive in our 4.8-star 270-review Google profile.

Overseas Clients Kings Town OLC Block

Kings Town's Overseas Block is designed for overseas Pakistani investors. Glorious Builders manages complete remote construction video consultation, digital contract, milestone payments, weekly video.See our overseas guide.

Raiwind Road Corridor Expertise

Our team works across the entire Raiwind Road corridor Al Kabir Town, Bahria Orchard, Lake City, Etihad Town. One team, consistent quality, shared logistics which reduces costs compared to contractors who operate in one society only.

Overseas Pakistanis

Build in Al Kabir Town From Abroad

Kings Town's dedicated Overseas Block along with Phase 2's affordable plot sizes makes Al Kabir Town one of Lahore's most accessible construction options for overseas Pakistanis on a budget. Many overseas families want to build their permanent home in Lahore without spending on DHA or Bahria Orchard land prices Al Kabir Town Phase 2 or Kings Town Overseas Block is the answer. Glorious Builders manages complete remote construction without site visits. For the full overseas process see our overseas Pakistani construction guide.

FAQ

Al Kabir Town Lahore Frequently Asked Questions

Grey structure in Al Kabir Town costs Rs 3,000–3,250 per sqft in 2026. A 5 Marla grey structure costs Rs 51 to Rs 63 Lac. Al Kabir Town construction costs are 5 to 8 percent lower than Bahria Orchard for the same Grade-60 rebar and 5-year warranty standard.
Phase 2 is the most active construction zone in 2026 particularly Ali, Umar, Usman, and Abu Bakar blocks. Development is complete, utilities are operational, and possession is available across most plots. Kings Town Sector A is fully developed for immediate construction. Phase 1 is established but has limited available plots. For overseas Pakistanis, Kings Town's Overseas Block and Phase 2 are the best options.
Economy turnkey is priced as per your written BOQ, not a fixed rate. Mid-range turnkey with imported tiles and quality bathrooms is priced as per your written BOQ, not a fixed rate. Timeline: grey structure 2 to 3 months, complete turnkey 6 to 8 months. All rates include Grade-60 rebar and premium cement same specification as larger plots.
Yes. Glorious Builders handles complete LDA approval for all Al Kabir Town phases architectural drawings, structural drawings, site plan, ownership documents, and all required forms. Submitted through LDA's One Window Cell. Zero rejection record. You visit no authority office at any stage.
Yes. Kings Town's Overseas Block is specifically designed for overseas Pakistani investors. Glorious Builders manages complete remote construction video consultation, 3D design on WhatsApp, digital contract, milestone payments with photo and video proof, weekly Friday site video.See our overseas Pakistani construction guide.

Ready to build in Al Kabir Town Lahore?

Site assessment. Written BOQ contract. 5-year warranty. LDA approvals handled. Overseas clients welcome

+92 323 9999 450  ·  cc@gloriousbuilders.com

WR

Waqas RanaOWNER

Glorious Builders · DHA Lahore · Since 2000

×

5 year warranty · 15 year structural guarantee

Assalamualaikum! Check your plot's construction estimate instantly, then get an exact figure through your BOQ.

Service

Grey structure Turnkey (complete) Renovation Commercial

Plot size

5 Marla 10 Marla 1 Kanal 2+ Kanal

Estimated cost

—

Get exact quote from Waqas Rana

Office: DHA Phase 6, Lahore · Replies within minutes

1