Construction Cost GuideUpdated April 2026

10 Marla House Construction Cost
Lahore 2026 Complete Budget Guide

By Glorious Builders · Updated April 2026 · 25 years in Lahore

Grey structure Rs 85–95 Lac. Economy turnkey Rs 1.05–1.3 Crore. Premium turnkey Rs 1.6–1.85 Crore. Society-wise breakdown for DHA, Bahria Town, Gulberg, Lake City, and all Lahore societies. Complete material and labour breakdown. Overseas Pakistani guide.

Quick Summary 10 Marla Construction Cost Lahore 2026

Grey structure only: Rs 85–95 Lac (standard A-grade, G+1, approximately 3,200 sqft covered area)

Economy turnkey: Rs 1.05–1.3 Crore (local tiles, standard kitchen, local bathroom fittings)

Mid-range turnkey: Rs 1.35–1.55 Crore (imported tiles, modular kitchen, quality bathrooms)

Premium turnkey: Rs 1.6–1.85 Crore (imported marble, custom kitchen, luxury fittings, false ceiling)

Grey structure per sqft: Rs 2,700–2,875/sqft (DHA higher, Bahria Town lower)

Timeline: Grey structure 4–5 months · Full turnkey 10–13 months from approval

A 10 Marla plot is the most popular residential plot size in Lahore's premium societies. Large enough for a comfortable 4 to 5 bedroom double-storey home, small enough to manage on a mid-range construction budget. In 2026, the 10 Marla house construction cost in Lahore ranges from Rs 85 Lac for a basic grey structure to Rs 1.85 Crore or more for a fully finished premium turnkey home.

This guide is based on Glorious Builders' actual project costs across DHA Phase 1 through Phase 9, Bahria Town all sectors, Gulberg, Lake City, Etihad Town, and 40+ other Lahore societies. We have been building in Lahore since 2000 these numbers reflect what real projects actually cost, not theoretical estimates.

One important clarification before we begin: the rates in this guide apply to covered area the total floor space of all floors not to plot size. A 10 Marla plot is 2,222 sqft of land. A 10 Marla double-storey house typically has 3,000 to 3,400 sqft of covered area depending on your society's bylaws and how much of the plot you build over. This distinction matters significantly when calculating your total budget.

Understanding 10 Marla Covered Area The Most Important Number

Before calculating any construction cost, you need to know your covered area not your plot size. Here is what determines covered area for a standard 10 Marla G+1 home in Lahore's major societies:

SocietyPlot SizeMax Ground CoverageTypical Covered Area G+1Notes
DHA Lahore (Phase 6–9)2,222 sqft60–65%3,000–3,200 sqftSetbacks reduce net coverage. Basement allowed in some phases.
Bahria Town2,222 sqft65–70%3,100–3,400 sqftBTAP bylaws allow slightly higher coverage than DHA.
Gulberg / LDA2,222 sqftVaries by block2,800–3,200 sqftLDA coverage varies significantly by plot category and block.
Lake City2,222 sqft65%3,000–3,200 sqftSimilar to DHA specification.
Etihad Town2,222 sqft65%3,000–3,200 sqftActive new construction zone.
Common Budgeting Mistake

Many homeowners calculate their budget by multiplying per-sqft rate by plot size (2,222 sqft). This is wrong. Always multiply by covered area (3,000–3,400 sqft). The difference on a Rs 2,800/sqft grey structure: Rs 62 Lac (wrong) vs Rs 85–95 Lac (correct). This miscalculation causes serious budget shortfalls mid-construction.

10 Marla House Construction Cost 2026 Complete Breakdown

Below is a complete cost breakdown for a standard 10 Marla double-storey house in Lahore using A-grade materials Grade-60 rebar, DG Khan or Lucky cement, first-quality kiln-fired bricks. All rates include both materials and labour unless otherwise noted.

Construction TypeEconomyStandard A-GradePremiumWhat's Included
Grey Structure OnlyRs 85–90 LacRs 88–95 LacRs 93–1.0 CroreFoundation, columns, beams, brickwork, all slabs, rough plumbing + electrical conduit
Economy TurnkeyRs 1.05–1.15 CroreRs 1.15–1.3 CroreGrey + local tiles, standard kitchen, local sanitary, local doors, paint. See turnkey service.
Mid-Range TurnkeyRs 1.35–1.45 CroreRs 1.45–1.55 CroreGrey + imported tiles, modular kitchen, RAK/Grohe sanitary, solid wood doors, POP ceiling
Premium TurnkeyRs 1.6–1.85 CroreGrey + imported marble, custom kitchen, luxury fittings, gypsum false ceiling, designer elevation. See interior design.

If your property already has an existing structure, consider renovation instead of rebuilding typically 40 to 60 percent cheaper for a structurally sound existing home.

Note: These figures are for DHA and Bahria Town standard construction. Gulberg and central Lahore areas cost 5 to 10 percent more due to urban access constraints. South Lahore societies like Lake City and Etihad Town are at the lower end of the range.

10 Marla Construction Cost by Society Lahore 2026

Construction costs vary by society due to access, bylaw compliance requirements, and authority inspection standards. Here is the breakdown:

Highest Spec
DHA Lahore Phase 6–9
Grey: Rs 88–98 Lac

DHA inspection at every slab. DHA-registered architect required. Turnkey: Rs 1.15–2.0 Crore. Phase 9 guide →

Best Value Premium
Bahria Town Lahore
Grey: Rs 85–95 Lac

BTAP approval. Higher coverage than DHA. Turnkey: Rs 1.05–1.75 Crore. Bahria Town guide →

Central Lahore
Gulberg Lahore
Grey: Rs 90–1.0 Crore

5–10% premium over DHA due to urban access. LDA approval. Turnkey: Rs 1.15–2.0 Crore. Gulberg guide →

South Lahore
Lake City Lahore
Grey: Rs 85–93 Lac

M-2 Motorway access. Competitive rates. Good infrastructure. Turnkey: Rs 1.05–1.65 Crore.

South Lahore
Etihad Town
Grey: Rs 83–92 Lac

Raiwind Road corridor. Most affordable rates in this guide. Growing rapidly. Turnkey: Rs 1.0–1.6 Crore.

Military Housing
Fazaia Housing Scheme
Grey: Rs 85–94 Lac

PAF approval required our team handles. Good infrastructure. Fazaia guide →

Material Cost Breakdown 10 Marla Grey Structure 2026

Understanding what drives grey structure costs helps you make informed decisions. Below is a detailed material breakdown for a standard 10 Marla G+1 home (approximately 3,200 sqft covered area) using A-grade materials.

MaterialQuantity (approx)RateTotal Cost (approx)Specification
Steel Rebar (Sarya)12,000–14,000 kgRs 290–320/kgRs 35–45 LacGrade-60. Amreli or Mughal Steel brand.
Cement800–1,000 bagsRs 1,150–1,300/bagRs 9–13 LacDG Khan or Lucky 53-grade OPC.
Bricks (Eent)80,000–95,000Rs 18–22/brickRs 14–21 LacFirst quality (awwal eent). Kiln-fired.
Sand (Rait)800–1,000 cftRs 120–160/cftRs 1–1.6 LacRiver sand. Clean, no silt.
Crush / Aggregate600–800 cftRs 130–170/cftRs 0.8–1.4 LacMargalla crush or equivalent clean aggregate.
Rough Plumbing (UPVC/PPR)Complete setRs 2–3.5 LacSupply in PPR, drainage in UPVC. Concealed in grey structure.
Electrical ConduitComplete setRs 1.5–2.5 LacPakistan Cables or equivalent. Concealed conduit only in grey structure.
Labour (Mazdoori)4–5 monthsRs 350–450/sqftRs 11–14 LacSkilled labour for masonry, shuttering, concrete.
Shuttering (Kapra)Per slabRs 3–5 Lac3 slab shuttering cycles for G+1.
External Plaster3,000+ sqft wallsRs 60–85/sqftRs 2–2.5 LacIncluded in grey structure scope.
Total Grey StructureRs 80–1.0 CroreVaries by exact specs and society
Why Construction Quotes Vary So Much in Lahore

You will see quotes ranging from Rs 70 Lac to Rs 1.2 Crore for a 10 Marla grey structure. The variation reflects differences in material grade, supervision quality, and overhead structure. Glorious Builders quotes Rs 2,700–2,875/sqft using Grade-60 rebar and premium cement specified by brand in every contract. Our 134 Google reviews at 4.8 stars spanning 2019 to 2026 are the evidence that competitive pricing and quality are not mutually exclusive.

Construction Phase Breakdown Where Your Money Goes

For a 10 Marla grey structure, here is how cost distributes across construction phases:

Phase 01
Foundation and DPC
Rs 12–18 Lac

Excavation, footing concrete, column starters, plinth beam, damp proof course. Soil conditions can significantly impact this cost weak soil requires deeper or wider footings.

3–4 weeks
Phase 02
Ground Floor Structure
Rs 20–28 Lac

Ground floor columns, brickwork walls, lintel beams, ground floor slab shuttering and casting. DHA or BTAP inspection at slab level. Largest single phase cost.

6–8 weeks
Phase 03
First Floor Structure
Rs 18–25 Lac

First floor columns, brickwork, lintel beams, first floor slab. Same specification as ground floor. Rough plumbing for first floor bathrooms concealed in walls during this phase.

5–7 weeks
Phase 04
Roof Slab and External Plaster
Rs 14–20 Lac

Roof slab casting including parapet walls, staircase canopy, water tank platform. External plaster of all exterior walls. Waterproofing of roof slab included.

4–5 weeks
For Overseas Pakistanis UK, UAE, USA, Canada, Saudi Arabia
Build Your 10 Marla Home in Lahore From Abroad Without a Single Site Visit

A significant share of 10 Marla plots in DHA Phase 9, Bahria Town, and other premium Lahore societies are owned by Pakistanis living abroad. Glorious Builders manages complete 10 Marla construction projects for overseas clients from design approval on WhatsApp to virtual handover with zero site visits required. Weekly Friday video from your construction site. Milestone payments only. 5-year warranty in writing.

UK Office: 205 Upper Tooting Road, London SW17 Mr. Muhammad Zubair Ghani
Pakistan Office: C-172 Sector J, DHA Phase 6 · 234 Jinnah Ave, Bahria Town Sector C
Payment: UK/UAE/Saudi bank transfer · Western Union · PayPak

Additional Costs Not Included in Per-Sqft Rates

The per-sqft rates above cover construction only. Budget these additional items separately for your 10 Marla house in Lahore:

  • Architectural and structural drawings: Rs 1.2–2.5 Lac depending on complexity
  • DHA building plan approval fee: Rs 60,000–1.2 Lac depending on plot size and phase
  • Bahria Town BTAP approval fee: Rs 40,000–80,000
  • LDA approval fee (Gulberg/LDA areas): Rs 40,000–1.5 Lac by plot category
  • Soil test: Rs 15,000–25,000
  • Boundary wall and main gate: Rs 8–20 Lac depending on design and perimeter
  • LESCO electricity connection: Rs 1.5–3 Lac
  • SNGPL gas connection: Rs 25,000–50,000
  • Boring (underground water): Rs 80,000–1.5 Lac if required
  • Contingency: Always budget 10% above your total quoted cost

For a standard 10 Marla house in DHA Lahore, additional costs typically total Rs 15–35 Lac above the construction quote. This is why a 10 Marla turnkey home that is quoted at Rs 1.2 Crore can cost Rs 1.4–1.5 Crore by the time all additional items are included.

Why Construction Costs Vary Between Contractors

You will receive quotes ranging from Rs 70 Lac to Rs 1.2 Crore for the same 10 Marla grey structure in Lahore. The variation is not random it reflects specific differences in what is included and what quality of materials is used.

Grade-40 vs Grade-60 rebar: Grade-40 rebar costs approximately 15 percent less than Grade-60. A contractor using Grade-40 on a 10 Marla house saves Rs 5–8 Lac on steel alone. The structural consequence reduced tensile strength in columns and beams typically manifests 8 to 15 years after construction. Every Glorious Builders grey structure uses Grade-60 rebar specified by brand in the signed contract not a verbal promise, a contractual obligation.

Second-quality bricks: Second-quality (doum) bricks cost Rs 12–14 each vs Rs 18–22 for first quality (awwal). A 10 Marla house uses 85,000–95,000 bricks the saving is Rs 5–8 Lac. Second-quality bricks have lower compressive strength and higher water absorption, leading to damp walls and cracking plaster within 3 to 5 years. Our contracts specify first-quality kiln-fired bricks by grade not by price.

Labour supervision: An unsupervised site where the contractor visits weekly rather than daily allows concrete to be poured with incorrect water ratios, steel to be placed at wrong spacings, and brick courses to be laid without proper mortar joints. These defects are invisible after plastering. A supervised site with a qualified engineer present every working day catches these issues before they are covered. Glorious Builders employs site engineers on every project, not supervisors.

How to Evaluate a 10 Marla Construction Quote in Lahore

When you receive a construction quote, ask four questions before signing anything. Glorious Builders founded 2000, 4.8★ 134 reviews answers all four correctly.

Question 1: What grade of steel? If the answer is not "Grade-60 from a named brand," ask why. Grade-40 is not acceptable for residential construction in Lahore's premium societies and will not pass DHA inspection.

Question 2: What cement brand? DG Khan, Lucky, and Fauji are the most reliable brands available in Lahore. Any quote that says "certified brand" without naming it should be treated with caution.

Question 3: Is the payment milestone-based? Legitimate contractors tie payments to verified construction progress not calendar dates or contractor requests. If a contractor demands 30–50% upfront before breaking ground, that is a significant warning sign.

Question 4: What warranty is in writing? A verbal warranty means nothing. Ask for the warranty terms in the contract duration, what it covers, what the remedy process is. Our 5-year construction warranty and 15-year structural guarantee are both in every signed contract.

Frequently Asked Questions

A 10 Marla grey structure costs Rs 85 to Rs 95 Lac in Lahore in 2026 for a G+1 home with approximately 3,200 sqft of covered area using standard A-grade materials. Economy turnkey costs Rs 1.05 to Rs 1.3 Crore. Mid-range turnkey with imported tiles and quality bathrooms costs Rs 1.35 to Rs 1.55 Crore. Premium turnkey with imported marble and luxury fittings costs Rs 1.6 to Rs 1.85 Crore. DHA Lahore is 8 to 12 percent higher than Bahria Town for the same specification.
A 10 Marla plot is 2,222 sqft of land. A 10 Marla double-storey house typically has 3,000 to 3,400 sqft of covered area the total floor space of ground and first floors combined. The exact covered area depends on your society's bylaws: DHA Phase 9 allows 60 to 65 percent ground coverage, Bahria Town allows 65 to 70 percent. Always calculate your construction budget using covered area, not plot size. Using plot size instead of covered area is the most common budgeting mistake for 10 Marla projects.
Grey structure for a 10 Marla double-storey home takes 4 to 5 months after building plan approval. Full turnkey construction grey structure plus all finishing takes 10 to 13 months from approval to handover. Adding design time (4 to 5 weeks) and DHA approval time (20 working days) or Bahria Town BTAP approval (2 to 5 weeks), the total from first consultation to handover is 12 to 15 months. Glorious Builders provides a week-by-week construction schedule at contract signing.
A 10 Marla grey structure in DHA Lahore costs Rs 88 to Rs 98 Lac in 2026. Economy turnkey costs Rs 1.15 to Rs 1.35 Crore. Mid-range turnkey costs Rs 1.4 to Rs 1.65 Crore. Premium turnkey costs Rs 1.65 to Rs 2.0 Crore. DHA rates are higher than Bahria Town due to DHA's stricter inspection process at every slab level, the requirement for DHA-registered architects, and the higher-spec materials DHA's approval process effectively mandates. For DHA Phase 9 specifically, see our dedicated DHA Phase 9 construction guide.
A 10 Marla grey structure in Bahria Town Lahore costs Rs 85 to Rs 95 Lac in 2026. Economy turnkey costs Rs 1.05 to Rs 1.25 Crore. Mid-range turnkey costs Rs 1.3 to Rs 1.5 Crore. Premium turnkey costs Rs 1.55 to Rs 1.8 Crore. Bahria Town construction is 8 to 12 percent less expensive than DHA for equivalent specification. Glorious Builders has a permanent office inside Bahria Town at 234 Jinnah Avenue, Sector C the only major Lahore construction company with a physical office inside Bahria Town. For full details see our Bahria Town construction guide.
Yes. Glorious Builders manages complete 10 Marla projects for overseas Pakistanis without any site visits. The process: video call consultation at your local time, 3D design approval on WhatsApp, DHA or Bahria Town approval handled by our team, digital fixed-price contract, milestone-based payments with photo and video proof, and a WhatsApp site video every Friday throughout construction. UK office: +44 7879 771153 (Mr. Muhammad Zubair Ghani, London SW17). For the complete overseas Pakistani process see our overseas construction guide.
A standard A-grade 10 Marla grey structure in Lahore uses: Grade-60 rebar from Amreli or Mughal Steel (12,000 to 14,000 kg), DG Khan or Lucky Cement 53-grade OPC (800 to 1,000 bags), first-quality kiln-fired bricks awwal eent (80,000 to 95,000 bricks), river sand, Margalla crush aggregate, UPVC drainage pipes, PPR water supply pipes, and Pakistan Cables electrical conduit concealed in walls. These are not optional upgrades they are the Glorious Builders standard on every project, specified by brand and grade in every signed contract.
Get a Free Quote

Share your plot location, size, and budget. We will send you a detailed estimate within 24 hours.

WhatsApp Now +92 323 9999 450

Ready to build your 10 Marla home in Lahore?

Free site assessment. Detailed cost estimate within 24 hours. Fixed-price contract. 5-year warranty. Overseas clients welcome UK office: +44 7879 771153.

+92 323 9999 450  ·  cc@gloriousbuilders.com  ·  UK: +44 7879 771153