DHA stage inspections and fines
Why it happens hereDHA staff inspect an under-construction house about every 20 days. Starting a stage before the previous one is inspected is fined (Rs 15,000 on the 2026 list), and so is not keeping approved drawings on site (Rs 10,000).
If it is ignoredRepeated fines, stopped work, and parts built against the drawing that must be broken.
How Glorious Builders handles itOur site engineer builds to the DHA-approved drawing, keeps drawings on site and books each stage inspection before the next stage starts.



















