Dream Gardens is a gated society by the Izmir group on Defence Road, between Bhobattian Chowk and Lake City. It is built in phases with 5 Marla, 10 Marla and 1 Kanal plots, and its location on the Defence Road corridor makes it a neighbour of Lake City, Fazaia and the DHA Phase 9 side.
Glorious Builders has been building houses in Lahore since 2000 from two offices, in DHA Phase 6 and Bahria Town Sector C. In Dream Gardens we handle the full sequence: plot survey, 2D floor plans and 3D front elevation, drawing approval, grey structure and finishing, on a written item-wise BOQ with a 15-year structural guarantee and a 5-year finishing warranty.
What We Build in Dream Gardens
Dream Gardens issues its own approved drawing set and inspects at plinth and roof stage. We prepare the submission drawings, attend the inspections and keep the stamped copies in your project file, so the completion certificate is not delayed at handover.
The figures below use our grey structure estimate of Rs 3,000 to Rs 3,250 per square foot of covered area. They are approximate; the exact price is the written BOQ for your drawings. Finishing is priced item by item on the same BOQ.
Plot size
Typical covered area
Grey structure estimate
5 Marla
about 1,700 to 1,950 sq ft (G+1)
Rs 51 to 63 lakh
10 Marla
about 2,950 to 3,375 sq ft (G+1)
Rs 88 to 110 lakh
1 Kanal
about 5,000 to 7,000 sq ft
Rs 1.5 to 2.3 crore
Chart: estimated grey structure budget by plot size. Source: Glorious Builders rate statement, Rs 3,000 to 3,250 per sq ft, approximate. See the full house construction cost guide and the cost calculator.
Drawing Approval in Dream Gardens
No excavation starts in Dream Gardens until the drawings are approved by the society's building control department. We prepare the architectural and structural set to the applicable bylaws, submit it, and keep the approved copies in your project file. Inspections during construction are attended by our site engineer.
How a Dream Gardens Project Runs
Site visit and plot survey (construction site visits are not charged).
2D floor plans and 3D front elevation to your plot and the bylaws.
Structural drawings and the written item-wise BOQ.
Drawing approval by the society's building control department.
Building a House in Dream Gardens Lahore: Real Problems and How We Solve Them
Dream Gardens still has many empty plots, so owners are often building the first house on their street. These are the problems owners here raise with us most, and how our in-house team handles each one.
Checking approvals before you build
Why it happens hereIn private schemes, the developer needs LDA approval to provide utilities such as gas, and building drawings need the society’s or LDA’s approval before work starts.
If it is ignoredA house built in a block whose approvals or utilities are not in place, or fines and stopped work for building without an approved drawing.
How Glorious Builders handles itOur architects check the approval position of your block and submit your drawings for approval before we start, and our engineers build to the approved drawing.
Building first in a developing block
Why it happens hereMany blocks here are newly developed, with empty plots on both sides and services still being connected.
If it is ignoredMaterial going missing, no water connection for curing, and a site no one watches between a contractor’s visits.
How Glorious Builders handles itWe arrange our own water for construction, keep material locked inside the plot, and keep our own site supervisor on the job every working day.
Foundation designed for your plot
Why it happens hereSoil is not the same on every plot, especially on land that was levelled recently.
If it is ignoredA foundation copied from another house, uneven settlement and cracks in walls and slabs.
How Glorious Builders handles itOur structural engineer designs the foundation from the soil test for your plot, and our site engineer checks excavation, compaction, steel and concrete before anything is covered.
Falling and poor-quality groundwater
Why it happens hereLahore’s groundwater level has dropped to around 164 feet and keeps falling by about 2.6 feet a year, and experts warn that its quality is getting worse as it falls.
If it is ignoredA house that depends on a weak bore, with tanks and pipes that scale up or leak.
How Glorious Builders handles itWe build a properly lined underground tank and overhead tank, and plan the plumbing so a filtration unit can be added on the main line without breaking finished walls.
No new gas connection for new houses (2026)
Why it happens hereThe federal government re-imposed the ban on new domestic gas connections in April 2026, and even paid demand notices were put on hold. This applies to every new house in Lahore, whatever the society.
If it is ignoredA kitchen and water heating planned around Sui gas that never arrives, then expensive changes after the finishing is done.
How Glorious Builders handles itOur architects plan the kitchen, geyser and roof for LPG, electric and solar from the drawing stage: cylinder space with ventilation, electric points sized for induction and heaters, and a roof ready for solar panels.
Why our houses do not run into these problems
In-house engineers and site supervisors on every stage, not a thekedar who visits once a week
Our own machinery and site equipment, so work does not stop when a hired machine or labour gang goes elsewhere
No sub-letting: the team that quotes your house is the team that builds it
Written, item-wise BOQ before work starts, 15-year structural guarantee and 5-year finishing warranty
Sources: Dawn and PDMA monsoon reports (July 2026), ARY News and ProPakistani on Lahore groundwater (October 2025), Government of Pakistan gas connection notices (April 2026).
Dream Gardens Construction FAQs
What does it cost to build a house in Dream Gardens?
Our grey structure estimate is Rs 3,000 to Rs 3,250 per square foot of covered area, so a 10 Marla G+1 house of about 3,300 sq ft comes to roughly Rs 88 lakh to 1.10 crore for the structure. Finishing is priced item by item on your written BOQ. These are approximate figures; the BOQ is the final price.
Who approves house drawings in Dream Gardens?
Drawings are approved by the society's building control department before excavation. Glorious Builders prepares the 2D plans, 3D elevation and structural set, submits them and attends the inspections.
Do you build in Dream Gardens for owners living abroad?
Yes. Many of our Dream Gardens clients are overseas Pakistanis. You receive dated site photos on WhatsApp at every stage, and payments are released stage by stage against those photos, never in advance of the work.
How long does a 10 Marla house take in Dream Gardens?
A 10 Marla grey structure typically takes 4 to 5 months, and a complete turnkey build 10 to 13 months, depending on the design and the approval timeline. The schedule is written into your contract with the BOQ.