Building a House in NFC Housing Society: What to Expect
NFC Housing Society is the National Fertilizer Corporation employees' cooperative society in Lahore, with Phase 1 on the Canal Bank Road side and Phase 2 towards Raiwind Road near LDA Avenue. Plots are mainly 5 Marla, 10 Marla and 1 Kanal.
Glorious Builders has been building houses in Lahore since 2000 from two offices, in DHA Phase 6 and Bahria Town Sector C. In NFC Housing Society we handle the full sequence: plot survey, 2D floor plans and 3D front elevation, drawing approval, grey structure and finishing, on a written item-wise BOQ with a 15-year structural guarantee and a 5-year finishing warranty.
What We Build in NFC Housing Society
Because NFC has two phases on different roads, the same house design can cost differently in each: material haulage and labour transport are quoted per site, and both lines appear separately in our BOQ so you can see them.
Construction Cost in NFC Housing Society by Plot Size
The figures below use our grey structure estimate of Rs 3,000 to Rs 3,250 per square foot of covered area. They are approximate; the exact price is the written BOQ for your drawings. Finishing is priced item by item on the same BOQ.
Plot size
Typical covered area
Grey structure estimate
5 Marla
about 1,700 to 1,950 sq ft (G+1)
Rs 51 to 63 lakh
10 Marla
about 2,950 to 3,375 sq ft (G+1)
Rs 88 to 110 lakh
1 Kanal
about 5,000 to 7,000 sq ft
Rs 1.5 to 2.3 crore
Chart: estimated grey structure budget by plot size. Source: Glorious Builders rate statement, Rs 3,000 to 3,250 per sq ft, approximate. See the full house construction cost guide and the cost calculator.
Drawing Approval in NFC Housing Society
No excavation starts in NFC Housing Society until the drawings are approved by LDA. We prepare the architectural and structural set to the applicable bylaws, submit it, and keep the approved copies in your project file. Inspections during construction are attended by our site engineer.
How a NFC Housing Society Project Runs
Site visit and plot survey (construction site visits are not charged).
2D floor plans and 3D front elevation to your plot and the bylaws.
Structural drawings and the written item-wise BOQ.
Building a House in NFC Housing Society Lahore: Real Problems and How We Solve Them
NFC Housing Society is an established society, so most new houses are rebuilds on older plots. These are the problems owners here raise with us most, and how our in-house team handles each one.
Rebuilding between existing houses
Why it happens hereThis is an established area, so most new houses are rebuilds on old plots, with neighbours’ walls right on the boundary and narrow access for material.
If it is ignoredCracked neighbour walls during demolition and excavation, disputes, and old foundations left under a new house.
How Glorious Builders handles itOur engineers plan the demolition and excavation to protect adjoining walls, remove old foundations, and design new footings from a soil test rather than reusing what was there.
LDA map approval and illegal-construction fines
Why it happens hereBuilding plans in LDA-controlled areas need approval before work starts. The Metropolitan Corporation Lahore has warned that it can fine illegal construction Rs 10,000 per day.
If it is ignoredA notice, daily fines, or a sealed site in the middle of construction.
How Glorious Builders handles itOur architects prepare and submit the map, and our engineers build only to the approved plan.
Seepage after heavy monsoon rain
Why it happens hereLahore received 343 mm of rain in 48 hours in July 2026 and water entered houses in many low-lying streets. A low plinth, a weak damp proof course or a flat roof without proper slope lets that water into walls and ceilings.
If it is ignoredDamp walls, salt on plaster, peeling paint and roof leaks within the first few rains.
How Glorious Builders handles itOur engineers set the plinth level for the street, lay the damp proof course at plinth level with a waterproofing layer, and give every roof proper slope, waterproofing and drainage outlets.
Falling and poor-quality groundwater
Why it happens hereLahore’s groundwater level has dropped to around 164 feet and keeps falling by about 2.6 feet a year, and experts warn that its quality is getting worse as it falls.
If it is ignoredA house that depends on a weak bore, with tanks and pipes that scale up or leak.
How Glorious Builders handles itWe build a properly lined underground tank and overhead tank, and plan the plumbing so a filtration unit can be added on the main line without breaking finished walls.
No new gas connection for new houses (2026)
Why it happens hereThe federal government re-imposed the ban on new domestic gas connections in April 2026, and even paid demand notices were put on hold. This applies to every new house in Lahore, whatever the society.
If it is ignoredA kitchen and water heating planned around Sui gas that never arrives, then expensive changes after the finishing is done.
How Glorious Builders handles itOur architects plan the kitchen, geyser and roof for LPG, electric and solar from the drawing stage: cylinder space with ventilation, electric points sized for induction and heaters, and a roof ready for solar panels.
Why our houses do not run into these problems
In-house engineers and site supervisors on every stage, not a thekedar who visits once a week
Our own machinery and site equipment, so work does not stop when a hired machine or labour gang goes elsewhere
No sub-letting: the team that quotes your house is the team that builds it
Written, item-wise BOQ before work starts, 15-year structural guarantee and 5-year finishing warranty
Sources: Dawn and PDMA monsoon reports (July 2026), ARY News and ProPakistani on Lahore groundwater (October 2025), Government of Pakistan gas connection notices (April 2026).
NFC Housing Society Construction FAQs
What does it cost to build a house in NFC Housing Society?
Our grey structure estimate is Rs 3,000 to Rs 3,250 per square foot of covered area, so a 10 Marla G+1 house of about 3,300 sq ft comes to roughly Rs 88 lakh to 1.10 crore for the structure. Finishing is priced item by item on your written BOQ. These are approximate figures; the BOQ is the final price.
Who approves house drawings in NFC Housing Society?
Drawings are approved by LDA before excavation. Glorious Builders prepares the 2D plans, 3D elevation and structural set, submits them and attends the inspections.
Do you build in NFC Housing Society for owners living abroad?
Yes. Many of our NFC Housing Society clients are overseas Pakistanis. You receive dated site photos on WhatsApp at every stage, and payments are released stage by stage against those photos, never in advance of the work.
How long does a 10 Marla house take in NFC Housing Society?
A 10 Marla grey structure typically takes 4 to 5 months, and a complete turnkey build 10 to 13 months, depending on the design and the approval timeline. The schedule is written into your contract with the BOQ.