Foundation and Plinth Work at Two Lahore Sites (April and June 2026)
Foundation and plinth are the parts of a house nobody sees after handover. These dated photos come from two Glorious Builders sites in Lahore.
| Location | Lahore (two sites) |
|---|---|
| Stages shown | Foundation brickwork, plinth fill compaction, grade beam steel |
| Photo dates | 14 April and 3 June 2026 |
14 April 2026: foundation brickwork
Footing walls are laid out on the excavated foundation to the structural drawing, with the masons working to string lines.



3 June 2026: plinth compaction and grade beam steel
At a second site, the plinth fill is compacted with a plate compactor while the grade beam steel cage is laid along the plinth walls before concrete.


What sits under your house
Foundation depth, steel and concrete grade are written into the BOQ from the structural drawing, and every stage is photographed and dated for the owner.