Foundation and plinth are the parts of a house nobody sees after handover. These dated photos come from two Glorious Builders sites in Lahore.

LocationLahore (two sites)
Stages shownFoundation brickwork, plinth fill compaction, grade beam steel
Photo dates14 April and 3 June 2026

14 April 2026: foundation brickwork

Footing walls are laid out on the excavated foundation to the structural drawing, with the masons working to string lines.

3 June 2026: plinth compaction and grade beam steel

At a second site, the plinth fill is compacted with a plate compactor while the grade beam steel cage is laid along the plinth walls before concrete.

What sits under your house

Foundation depth, steel and concrete grade are written into the BOQ from the structural drawing, and every stage is photographed and dated for the owner.

WR

Waqas RanaOWNER

Glorious Builders · DHA Lahore · Since 2000

×

5 year warranty · 15 year structural guarantee

Assalamualaikum! Check your plot's construction estimate instantly, then get an exact figure through your BOQ.

Service

Grey structure Turnkey (complete) Renovation Commercial

Plot size

5 Marla 10 Marla 1 Kanal 2+ Kanal

Estimated cost

—

Get exact quote from Waqas Rana

Office: DHA Phase 6, Lahore · Replies within minutes

1