Plumbing Rough-In Before Plaster and Flooring: DHA Lahore House (September 2026)
On 20 September 2026 our plumbing team finished the rough-in at a house in DHA Lahore: water lines, bathroom drain points and sewer pipes, all fixed before plaster and flooring close the walls and floors.
| Location | DHA Lahore |
|---|---|
| Stage shown | Plumbing rough-in (first fix) |
| Photo date | 20 September 2026 |
| Materials visible | PPR water supply lines, PVC drain and sewer pipes |
Sewer and floor drains
Sewer stubs and floor drains are set at their final positions and levels before the floor is filled and concreted, so water drains towards them.


Bathroom points and water lines
Bathroom water points and drain outlets are fixed in the brick walls, and PPR supply lines run along the walls to each point. This is the stage to check positions: after plaster and tiles, moving a pipe means breaking finished work.



Plumbing is a line in your BOQ
Pipe brands, sizes and points are written into the BOQ before work starts, so the owner can check them on site against these photos.