Quick answer (updated November 2026): Grey structure is the house built up to plaster, without finishes. Turnkey construction is the complete house, ready to move into. Choose grey structure if you can supervise the site and want to finish later or with your own trades. Choose turnkey if you want one company responsible from drawings to keys, which is what most overseas owners pick. In Lahore, grey structure is estimated at approximately Rs 3,000 to Rs 3,250 per sq ft; finishing has no fixed rate and is priced in a written BOQ.
Every house owner in Lahore reaches this decision early: hand a builder the structure only, or the whole house. The two contracts differ in what you receive, how the price is set, how long the work takes and how much of it you manage yourself. This guide sets grey structure and turnkey construction side by side, using how Glorious Builders has built houses in Lahore since 2000.
What is grey structure?
Grey structure is a house that stands complete in concrete, brick and plaster but has no finishes. It normally covers excavation and foundations, columns, beams and roof slabs, brick walls, the staircase, plaster, and the pipes and electrical conduits buried in walls and floors. The name comes from the colour of bare cement.
The exact list is written in the BOQ, and that list is where quotes differ: one builder includes the boundary wall, water tanks and septic tank, another leaves them out. Read what is included in grey structure construction and see our grey structure construction service in Lahore.

What is turnkey construction?
Turnkey construction means the builder delivers the finished house and you turn the key. It is the grey structure plus every finishing trade: flooring, paint, ceilings, doors and windows, kitchen and wardrobes, bathrooms, switches and lights, external finishes and the gate. You choose the materials, the builder buys, installs and guarantees them. See our turnkey construction service in Lahore.
Where grey structure stops and finishing begins
A grey structure contract ends after plaster; a turnkey contract continues through finishing to handover. The hand-over point between the two matters, because finishing teams need to know where pipes, drains and conduits run. When one company does both, that knowledge stays in one set of drawings.
Grey structure vs turnkey, side by side
The deciding factors are who manages the finishing, how the price is fixed and how many contracts you sign.
| Grey structure | Turnkey | |
|---|---|---|
| What you receive | Structure, walls, plaster, buried services | Complete house, ready to live in |
| Price basis | Approx. Rs 3,000 to Rs 3,250 per sq ft of covered area; final figure in the BOQ | No fixed rate; finishing priced item by item in the BOQ |
| Typical time (10 Marla or 1 Kanal) | About 4 to 5 months | About 10 to 13 months |
| Contracts you manage | One for structure, then several finishing trades | One |
| Your time on site | High during finishing | Low; decisions on materials only |
| Control over finishes | You buy and choose everything later | You choose; choices are written into the BOQ before work starts |
| Main risk | Coordination between structure and finishing teams is yours | Depends on how detailed the BOQ is |
| Guarantee with Glorious Builders | 15-year structural guarantee | 15-year structural guarantee and 5-year finishing warranty |
| Suits | Owners nearby, staged budgets, builders selling grey | Overseas owners, busy families, first-time builders |
How long does each take?
For a typical 10 Marla or 1 Kanal house in Lahore, grey structure takes about 4 to 5 months and a complete turnkey house about 10 to 13 months. Finishing takes longer than structure because many trades follow one another and materials are selected and ordered along the way.
What decides the cost?
Both contracts are priced on covered area, not plot size. Grey structure is estimated at approximately Rs 3,000 to Rs 3,250 per sq ft, and the figure moves with steel, cement and the foundation your soil needs. Turnkey has no rate per square foot, because finishing choices decide most of the difference: local or imported tiles, solid or engineered wood, the kitchen, the sanitary fittings.
| Cost question | Where to look |
|---|---|
| How big will my house be? | Covered area of 5 Marla, 10 Marla and 1 Kanal houses |
| Grey structure estimate for my plot | Grey structure cost calculator and grey structure rate in Lahore |
| 10 Marla, 5 Marla or 1 Kanal totals | 10 Marla cost, 5 Marla cost, 1 Kanal cost |
| How the final price is fixed | BOQ for house construction in Lahore and the 10 Marla BOQ guide |
| Steel price today | Steel rate in Pakistan |
How to decide between grey structure and turnkey
Decide on two things: whether you can be on site every week, and whether you want to finish now or in stages.
Grey structure is the better choice when
- You want to pause after the structure and finish when funds allow.
- You already have trusted finishing people, or you plan to sell the house as a grey structure.
- You live nearby and have the time to buy materials and manage trades.
Turnkey is the better choice when
- You live abroad or in another city.
- You want one company answerable for the whole house, under one guarantee.
- You want the materials and the total settled in writing before work starts.

If you live abroad
Overseas Pakistanis usually choose turnkey, because managing tile setters, carpenters, painters and electricians from another country is where most remote builds go wrong. What protects you is the paperwork: a written BOQ, payments tied to completed stages and regular photo and video updates from the site. Read our guide to building a house in Lahore from abroad.
Five questions to ask any builder before you choose
- What exactly is in the grey structure? Ask for the item list: boundary wall, tanks, septic tank, porch, plaster inside and out.
- Who does the work? The company’s own engineers and site teams, or a labour contractor it hands the job to?
- How is turnkey priced? A rate per square foot hides the material choices. Ask for an item-wise BOQ with brands and quantities.
- What is guaranteed, and for how long? Structure and finishing carry different periods. Get both in the contract.
- Who handles approvals? Map approval and the completion certificate in DHA Lahore, Bahria Town Lahore or Lake City should be part of the job, with drawings by architects who know the bylaws.
Questions and answers
What is the difference between grey structure and turnkey construction?
Grey structure is a house built up to plaster: foundations, columns, beams, slabs, brick walls and buried pipes and conduits, with no finishes. Turnkey construction is the complete house: grey structure plus flooring, paint, doors, windows, kitchen, bathrooms, electrical fittings and woodwork, handed over ready to live in.
Is turnkey construction more expensive than grey structure?
Yes, because turnkey includes all finishing work on top of the structure. In Lahore, Glorious Builders estimates grey structure at approximately Rs 3,000 to Rs 3,250 per sq ft. Finishing has no fixed rate; it depends on the tiles, wood, sanitary ware and fittings you choose and is priced item by item in a written BOQ.
Can I build the grey structure first and do the finishing later?
Yes. Many owners in Lahore build the grey structure, pause, and finish when funds allow. Close the structure properly before the pause, and keep the drawings and guarantee with one company so the finishing team is not guessing where pipes and conduits run.
Which is better for overseas Pakistanis, grey structure or turnkey?
Turnkey usually suits overseas Pakistanis better, because one company is responsible from drawings to handover and the owner does not have to hire and check separate finishing contractors from abroad. A written BOQ and regular photo and video updates matter more than the contract name.
How long does grey structure take compared with turnkey?
For a typical 10 Marla or 1 Kanal house in Lahore, grey structure takes about 4 to 5 months and a complete turnkey house about 10 to 13 months. Design changes, society approvals and monsoon weather can add time.
What is included in grey structure construction?
Grey structure normally includes excavation, foundations, columns, beams, roof slabs, brick walls, the staircase, plaster, and the pipes and electrical conduits buried in walls and floors. Items such as the boundary wall, water tanks, septic tank and porch vary between builders, so check them in the BOQ.
Does the guarantee change between grey structure and turnkey?
The structure carries the same 15-year structural guarantee from Glorious Builders in both contracts. The 5-year finishing warranty applies to finishing work when Glorious Builders carries it out.
Is turnkey the same as a fixed-price package?
No. Glorious Builders does not sell fixed packages. A turnkey house is priced through its own written BOQ, built from your drawings and the materials you choose, so two houses of the same size can have different totals.
Related guides
- Residential construction in Lahore
- House construction cost in 2026
- House construction cost calculator
- How to compare construction companies in Lahore
- Structural drawings in Lahore
- Our projects with dated site photos
Send your plot size, society and drawings if you have them. We will explain both options for your house and prepare a written BOQ.
Planning your own house? Cost guides from Glorious Builders:
Written by Hafiz Furqan Ahmad. Reviewed by Waqas Rana, Owner, Glorious Builders.